Planning acclimatisation

In short

Acclimatisation lets the flooring settle to the conditions of the room it will be fitted in. It only works if the room conditions are already right.

  1. Plan for the flooring to arrive once the room meets the conditions in Is the room ready for wood flooring?
  2. Allow the time stated in the instructions supplied with your flooring. As a general guide, engineered wood flooring usually needs 48 to 72 hours. Solid wood needs longer.
  3. Acclimatise in the room where the floor will be fitted, not in a garage, shed, conservatory or a different part of the building.
  4. Rigid core (SPC and VSPC) floors usually need less time. Always follow the product instructions.
Important

Acclimatisation is not a way to fix a damp building. Leaving flooring in a room that is too damp or too dry will make problems worse, not better.

Most wood floor problems are traced back to site conditions, moisture or installation, not the product. Following this guidance and the instructions supplied with your flooring is the best way to avoid them.